References:

Completed projects of the Geomechanical team members

4797 long meters of CFA piles were made, that is - 652 pieces

594 long meters of CFA piles were made, that is 99 pieces.

670 long meters of CFA piles were made, that is 63 pieces.

Drilled piles with CFA technology Ø600mm were made

414 square meters of reinforced concrete diaphragm and 1717 long meters of CFA secant piles were made, that is 172 pieces.

The diaphragm D = 600mm, 1200 square meters was made.

Production of AB diaphragms D = 600mm and D = 450mm in the protection of the foundation pit L = 22,00m as well as CFA piles for the foundation of the building 6000mm

800 mm CFA piles were made to fund the structure

Completed CFA piles 1076 pieces, 600mm.

CFA piles of 207 pieces, 600mm, have been completed.

Construction of protection of the foundation pit as well as the main road wall with interconnected CF piles. Investor - REW Energy d.o.o. Installed power - 13.2 MW Installed flow - 150 m3 / s Medium flow - 73.9 m3 / s Annual production - 57 763 466 KW

Construction of protection of the foundation pit as well as the main road with a wall of interconnected CF piles, provision of the future derivation tunnel D = 8m. Investor - REW Energy d.o.o. Installed power - 24 MW Installed flow - 150 m3 / s Medium

Classically drilled piles of 57 pieces of 800 mm and CFA piles of 269 pieces of 800 mm were made. The works are still in progress.

Classically drilled piles of 57 pieces of 800 mm and CFA piles of 269 pieces of 800 mm were made. The works are still in progress.

CFA piles of 63 pieces 670mm were made.

CFA piles 800mm were made

Drilled CFA piles were made.

600 mm drilled CFA piles were made.

600 mm drilled CFA piles were made.

Classic drilled piles without pipe diameter Ø800mm

Classic drilled piles without pipe diameter Ø800mm

Classic drilled piles without pipe Ø600mm

Execution of classically drilled piles Ø600mm and Ø400mm for the needs of protection of the foundation pit

Production of AB diaphragm D = 600mm for protection of the foundation pit and classically drilled piles Ø600mm within the foundation structures of the building

CLASSIC DRILLED PILLARS WITHOUT HOSE Ø1000MM

Construction of the foundation structure, CFA piles Ø600mm

Execution of classically drilled piles Ø800mm for foundation construction

CFA piles Ø600mm were made to build the foundation structure

Production of AB diaphragms D = 600mm in the protection of the foundation pit and production of CFA piles Ø600mm for the foundation of the building. Works are still in progress.

Production of CFA piles Ø1000mm.

Classically drilled piles 800mm in protection L = 12.40m and CFA piles for foundation of the building L = 15.00m 800mm were made

Production of CFA piles 1000mm, 38 pieces.

Protection of the foundation pit and foundation of the CFA 600mm facility for the investor ENERGOPROJEKT VISOKOGRADNJA

CFA 600mm piles for investor ZOP INŽENJERING

Lamellas Ž, I and J were made, CFA piles 600 mm for the investor BEST CONSTRUCTION

Lamellas G, Đ and E were made, CFA piles 600 mm for the investor WD CONCORD WEST

CFA piles 600mm for the investor UDARNIK GRADNJA BELGRADE

Lamellas 1, 2 and 3 are being made, CFA piles 600 mm, for the investor WD CONCORD WEST.

Lamels Z and D are being made, CFA piles 600 mm for the investor BEST CONSTRUCTION.

Diaphragms D = 450mm are made for the investor WD CONCORD WEST.

CFA piles 600mm are being made for the investor UDARNIK GRADNJA, Belgrade.

CFA piles Ø1000mm (HR 300)

CFA piles Ø600mm

CFA piles Ø600mm

CFA piles Ø600mm

Classic drilled piles without pipe Ø600mm

CFA piles Ø600mm

GEOMECHANICAL TEAM

Thank you for visiting our website. You can contact us by e-mail and we will do our best to respond as soon as possible. You can also contact us by phone or follow us on a social network.

Bulevar Zorana Đinđića 89
Belgrade, Serbia 11000

office@gmtim.rs

+381 11 618 36 49

Your message is sent. Thank you!